Heat Pump Grant Ireland: SEAI Eligibility and Step-by-Step Application (2026)

By Kilowiq ·

Published

Contractor discussing a heat pump installation with a homeowner outside an Irish terraced house with a heat pump on the side wall

To get the SEAI heat pump grant in Ireland, you choose an SEAI-registered contractor, apply to SEAI for a grant offer before any work starts, accept it within 30 days, complete the work, get a post-works BER and then claim payment. SEAI says the maximum for a house is €14,500 and that payment usually follows within 4 to 6 weeks of receiving your forms. This guide walks through who is eligible, what you need and the mistakes that can cost you the grant.

Last updated: 10 October 2026. SEAI changes grant amounts and rules from time to time, so confirm the details on the SEAI website before you sign a contract. For typical prices, see our guide to heat pump costs in Ireland.

What the grant covers

SEAI lists the grant as a bundle. The figures are maximums, not guaranteed payments, and a grant cannot be more than the total cost of the works.

PartMaximum
Heat pump unit grant€10,500
Central heating grant, for radiator or underfloor heating upgrades that are required€2,000
Boiler scrappage grant, for removing an oil or gas boiler, electric storage or solid fuel system€2,000
Total for an air to water, ground source, exhaust air or water to water system in a house€14,500
Total for the same systems in an apartment€11,500
Air to air heat pump€9,500
Replacing an existing heat pump that was never grant-aided€6,500 (€4,500 for apartments), with no scrappage or central heating grant
Technical assessment€200

SEAI also notes a €50 grant towards the post-works BER. The central heating part only applies where upgrades are needed, which is why it is worth reading our guide on whether you need new radiators before you accept a contractor’s plan.

Who is eligible?

SEAI’s heat pump page says these can apply: owner occupiers, private and commercial landlords of tenanted properties, companies including owner management companies, registered charities, holiday-home owners and Approved Housing Bodies. The home also has to meet these conditions:

  • It has an MPRN. This is the 11-digit number on your electricity bill. You need it to apply.
  • It was built and occupied before 2021.
  • The work is done by an SEAI-registered contractor.

SEAI also says the home should be well insulated to get the most from a heat pump. If your home loses a lot of heat, ask your contractor whether insulation work should come first.

Do you need a technical assessment?

  • Homes built before 2007: you need a technical assessment if you have no valid BER, or if your BER shows high heat loss. You do not need one if your valid BER shows a Heat Loss Indicator (HLI) of 2.3 W/(K.m²) or less. In that case you use a self-declaration form.
  • Homes built from 2007: a technical assessment is not required. You use the self-declaration form instead. You may still choose to have an assessment, and fabric upgrades are not mandatory.

Where a technical assessment is needed, SEAI says the advisor must be SEAI-registered and must sign a written contract with you before the assessment begins.

One change to be aware of. A July 2026 SEAI document says the 2.3 W/(K.m²) HLI requirement has been relaxed for the One Stop Shop service, the Community Energy Grant programme and, when the team advises it, the Warmer Homes Scheme. SEAI says Better Energy Homes is unchanged: an HLI of 2.3 W/(K.m²) or less must still be achieved before the grant is paid, and contractors from those other programmes cannot apply the flexibility to Better Energy Homes installations.

How to apply, step by step

This is the standard Better Energy Homes route, where you pay the contractor and claim the grant afterwards. SEAI’s heat pump page sets out the order:

  1. Find a registered contractor and get quotes. Use a contractor on the SEAI register for this type of work. Get a written contract that covers the work, prices, timing, payment terms and warranties. Our guide to comparing heat pump quotes shows what to check line by line.
  2. Apply to SEAI for a grant offer. Works must not start before you have approval. Online approval is usually given in minutes. If you apply by post, SEAI expects to send an offer within 5 working days. You have 30 days to accept the offer, or you must re-apply.
  3. Get the work done. You have eight months from the date of the grant offer to draw down the grant, and the work must be done by an SEAI-registered contractor.
  4. Arrange a post-works BER. A registered SEAI BER Assessor must complete it before the grant can be paid.
  5. Submit your evidence. This is the Declaration of Works, signed by you, your BER assessor and your contractor, along with the contractor’s heating design sheet and eco design data sheet, plus the Request for Payment form. If you receive more than €10,000 in grant payments in a single calendar year, you also need a Tax Clearance Certificate.
  6. Get paid. SEAI pays into your nominated bank account, usually within 4 to 6 weeks of receiving the forms. SEAI may inspect the home, and if rework is needed the contractor must return, which can delay payment.

On this route you normally pay the contractor first and the grant is paid to you later, so plan your cash flow. The Irish Government says grant-supported upgrades can be financed through the Home Energy Upgrade Loan Scheme. We cover how that works in our Irish cost guide.

Or use a One Stop Shop

SEAI says a One Stop Shop can manage the whole upgrade from start to finish and apply for the grant on your behalf. The grant is deducted from the cost of the work upfront by the selected One Stop Shop. The SEAI page links a complete upgrade to a minimum B2 BER through this route, so ask what the service will include. Because it changes how much you pay on day one, ask each installer which route they work with.

Mistakes that can cost you the grant

  • Starting work before approval. SEAI says works must not start before you have approval.
  • Missing the 30-day acceptance window. After 30 days you must re-apply.
  • Running out of time on the work. SEAI’s general application guide says extensions to offer periods are not given and that works done outside the offer period are ineligible. Check the expiry date on your own offer.
  • Forgetting the post-works BER. It is needed before payment, and there is a €50 grant towards it.
  • Sending late or incomplete forms. SEAI’s general guide says late forms are ineligible and incomplete or missing forms are returned, which can delay or cancel a claim.
  • Using a contractor who is not SEAI-registered. Check the SEAI register before you sign.

Keep your invoices and receipts, and keep copies of every form you sign. If you also hit a cost that was not in the quote, see our guide to hidden costs on a heat pump quote.

A note on conflicting dates

SEAI’s pages do not always match. The heat pump page says the home must have been built and occupied before 2021 and gives eight months to complete the work. SEAI’s general how-to-apply page mentions different home-age cut-offs and a six-month limit for other upgrades. We have followed the heat pump page for heat pumps, but the dates in your own offer letter are the ones that count, so check the expiry date when you receive it.

If you also need the UK picture, the Boiler Upgrade Scheme works differently. See our guide to the Boiler Upgrade Scheme in England and Wales.

Dates and cash flow: a Kilowiq worked example

Suppose SEAI sends your grant offer on 1 November 2026. This table counts forward using the time limits in this guide.

StepTime limitExample date
Grant offer received1 November 2026
Accept the offerWithin 30 daysBy 1 December 2026
Complete the workEight months, per SEAI’s heat pump pageBy 1 July 2027
Grant paidUsually 4 to 6 weeks after completed formsIf forms go in on 1 June 2027, about 29 June to 13 July 2027

Cash flow on the Bord Gáis example. The price of €17,200 and the unit grant of €10,500 come from our cost guide. On the standard route you pay the contractor first, so your cash outlay peaks at €17,200 and falls to €6,700 once the grant arrives. With a One Stop Shop the grant is deducted upfront, so you would pay about €6,700 directly, if the quote matches the example. Also note that a €10,500 grant is above the €10,000 level at which SEAI asks for a tax clearance certificate, so you should plan for that on the standard route.

Three tips from Kilowiq

  1. Do not let the contractor start work until you hold the offer.
  2. Work backwards from the deadline when you book the installation, and allow time for the post-works BER.
  3. If you cannot fund the full price first, compare the One Stop Shop route with the loan option.

Frequently asked questions

How long does the SEAI heat pump grant take to arrive?

SEAI says payment usually arrives within 4 to 6 weeks of receiving your completed forms, after the work and the post-works BER are done. Rework, inspections or missing documents can delay it.

Can I start the work before I get the grant offer?

No. SEAI says works must not start before you have approval for your application.

What is an MPRN and where do I find it?

It is the 11-digit Meter Point Reference Number for your electricity supply. SEAI says it is on your electricity bill, and you need it to apply.

Do I need a technical assessment?

For homes built before 2007, yes, unless you have a valid BER showing a Heat Loss Indicator of 2.3 W/(K.m²) or less. For homes built from 2007, no. You use a self-declaration form.

Can landlords apply?

SEAI lists private and commercial landlords of tenanted properties among the people who can apply.

Do I need a tax clearance certificate?

Only if you receive more than €10,000 in grant payments in a single calendar year. SEAI says it is then needed when you claim.